Central cooling supply for the City of Chemnitz, Germany

Principal: Stadtwerke Chemnitz AG

Realisation Period: 2004

Services: Technical Facilities

The central cooling system is supplying several buildings down town Chemnitz via pipeline grid constructed in the 1960’s. In 2004, AIC received the mandate for engineering following:

  • 3 new absorption cooling machines (2 x 1.8 MWp, 1 x 0.725 MWp)
  • 1 turbo cooling water substitution machine (3 MWp)
  • Re-cooling via 10 open evaporation towers
  • Electrical installations and process measuring and control Technology

Construction Costs: 1.5 mill. EUR