Modernization of an office and laboratory building 351 in Chemnitz, Germany

Principal: Volkswagen Sachsen GmbH - Motorenwerk

Realisation Period: 2004 - 2009

Services: General Engineering

Volkswagen Chemnitz studied the re-use of an existing office and production building. For that purpose AIC received the mandate to engineer the modernization.

Targed of the designing work was, to demonstrate the principal options (using visual modelling) to enhance the building from architectural perspective, to schedule the next milestones and to prepare the budget for the project.

At the same time, AIC has designed the new company‘s cafeteria.

Total Investment: 4.5 mill. EUR