Dismantling residential buildings and reconstruction to shopping center / offices in Chemnitz, Germany

Principal: Wohnungsbaugenossenschaft Einheit eG

Realisation Period: 1999 - 2000

Services: General Engineering

By a coordinated dismantling, the upper floors and two parts (up to the cellar) of the building were completely reduced. During the whole construction time, especially during dismantling phase, and considering the new use of the remaining building, remarkable technological and structural safeguarding measures were necessary.

Parameters:

Length of the building  72 meters

Depth of the building  12 meters

Height of the building  19 meters

Volume of dismantling 7,500 cbm

Construction Costs: 3 mill. EUR