Engineering of a Co-Generation Unit in Penzberg, Germany

Principal: Hörmann Automotive Penzberg

Realisation Period: 2014

Services: Technical Facilities

Engineering of a combined heat and power generation unit based on a gas operated engine made by GE and developing of an external cooling system. Total installed power: 330 kWp.
The co-generation unit is integrated into the heat recovery system of the paint shop.
By installing this combined system, the annual electricity generation could be siginificantly increased while the gas consumption remains the same.

Total Investment: 560,000 euros