AIC – Runners team in front of a record crowd

Chemnitz, 05th September 2018

In the history of the Chemnitz’ run challenge, there were never before that high number of people participating. Around 9,000 runners from more than 700 companies attacked the 4.8 km track through the City of Chemnitz. The AIC headquarter in Chemnitz sent a mixed team of 8 women and men. With a tracked time under 21 minutes, Matthias Koehler ranked amongst the best 700 this year. Congratulation!

The residential estate „Prinz-Eugen-Park“ in Munich is growing

Munich, 04th September 2018

While some of the houses of the residential area in Munich are handed over already, other buildings are still under construction at full speed. A pool of apartment providers, real estate companies and developers was created to realize jointly this ambitious real estate project.
As part of an ecological pilot area, the apartment provider GEWOFAG and the general contractor B&O Group are realizing an apartment complex with 180 units on separate plot. The construction is structured as wooden-hybrid with 5 floors in two opposite, L-shaped buildings. A new underground car park provides 140 units. The construction project will be completed with a kindergarten and a community area.
AIC is supporting this project with the detailed engineering.

Relocation into new production building

Chemnitz, 24th August 2018

The SITEC Industrietechnologie GmbH is announcing the successful commissioning of a new production building of its division “volume production”. At the moment, the relocation of staff and the move-in of equipment is going on.

The company is engineering and realizing production systems for different industries like automotive and alternative energies, but is producing components with high quantities, like diesel injection devices, for automobile industry too.

The construction of the new manufacturing hall on an extended company area in Chemnitz started in 2017 already. About 6 million euros were invested in 3,500 sqm production space, a new central reception area and modern conference rooms. Additional 6 million euros were spent for production equipment.

AIC has supported this project as general engineering partner.

Attractive new apartments in Hartmannsdorf

Chemnitz, 23rd August 2018
The activities of the Wohnungsbaugenossenschaft Burgstaedt eG (WBG) for letting new apartments showed a rising demand on larger modern units. With comfortable 3 to 4 room-units, the WBG wants to extend its portfolio especially with space for young families. For that reason, this provider of apartments is planning to construct a new residential building on an available plot of land in the town Hartmannsdorf close to Chemnitz. These 14 apartments with a size between 75 and 105 sqm will be equipped with elevator, kids’ rooms and extras like terraces, balconies or loggias and open kitchens. The customers will have very early the chance to place their own individual ideas regarding the layout of the apartment.
AIC will support this project as general engineering partner.

Exhibition “Architects in Chemnitz – Projects and Ideas”

Chemnitz, 12th of June 2018

On the 23rd and 24th of June 2018, everywhere in Germany takes place the “Day of Architecture”. For that reason and between 16th and 24th of June, architects based in Chemnitz presenting their different kinds of projects in a shopping mall of the city center too. They want to demonstrate the redesigning of and the change in using such buildings. The presentations of the local architects and companies will show on one hand the vital, ecological, emotional and aesthetical, but on the other hand social and economic designing of living and working space.

On the 18 th of June, the Chamber for Architects is arranging a press meeting to celebrate the opening of the Exhibition.

AIC takes part and will present some projects and its services.