New Waste-To-Energy Plant Klaipeda, Lithuania

Principal: Fortum Baltic Investments SNC

Realisation Period: July 2010 – January 2011

Services: Structural Engineering

First waste-to-energy plant in the Baltic states.

AIC is assigned for complete structural Engineering.

Structural calculation of the steel structure of the boiler house incl. auxillary facilities (framework analysis and structural connection design)

Steel Structure: 1,300 t

Total Investment: 120 mill. EUR