Construction of a cooling reservoir in Chemnitz, Germany

Principal: Stadtwerke Chemnitz AG

Realisation Period: 2006 - 2007

Services: General Engineering

The utility provider of Chemnitz has chosen an innovative way of climatizing buildings by using a long-way cooling system. This new cooling reservoir with a cooling energy of about 32MWh is part of a unique cooling grid down town Chemnitz with a total length of 5,000 meters and about 25 consumers in 21 different buildings.

Parameters:

Reservoir volume  3,500 cbm

Diameter  16,5 m

Height  17 m

Total Investment: 2.0 mill. EUR