New Production Hall in Penig, Germany

Principal: MetaTec-Penig Schweißtechnik GmbH

Realisation Period: 2006 - 2008

Services: General Engineering

This production hall is specially made for metal works (milling, drilling, grinding) and used in a two-shift-system.

The hall is constructed as two-span-building with 1,330 sqm. Both parts are equipped with cranes and enough space for special machine tools, storage and quality testing are available.

There was a special requirement for noise protection, because of locting this production facility within a mixed zone for residential and business.

The soil conditions were complex and difficult.

Construction Costs: 1.7 mill. EUR