New Production Site for Solar Cells in Bischofswerda, Germany

Principal: Arise Technologies

Realisation Period: 2007 - 2008

Services: General Engineering

Investment in a new production facilty for crystalline solar cells. The manufacturing process, an innovative coating technology, will increase the efficiency of the cell to produce electrical energy.

Within 12 months only, the production capacity will be extended from 35MW up to 45MW p.a.

The manufacturing site allows to integrate 4 production lines.

Total Investment: 25 million EUR

Investment in Building: 11 million EUR

Parameter of Production Facility:

– 2 Floors

– total 8.900 sqm