Power Plant Datteln 4, Germany

Principal: E.ON Kraftwerke GmbH

Realisation Period: March 2008 – August 2008

Services: Detail Engineering Building/Coaling

EON Kraftwerke GmbH is constructing a new power block at the existing power plant site Datteln. The new block has a capacity of 1.1 gigawatt.

Hitachi Power Europe GmbH was contracted to construct the steam generator.

AIC is assigned for detailed Engineering of the sophisticated steel structure in the coaling area.

Total Investment: 1.2 billion EUR

Steel Structure: 300 t