Waste-to-energy plant Ruhleben, Germany

Principal: Berliner Stadtreinigungsbetriebe

Realisation Period: April 2008 – February 2010

Services: Building, Structural Engineering

Berliner Stadtreinigungsbetriebe (BSR) on its waste treatment site in Berlin and while executing a replacement investment, plans an extension of the waste-to-energy plant.

The new furnace unit with a joined exhaust gas treatment is substituting 4 elder units.

The construction is realized during running operation.

AIC received the mandate for General Engineering at:

-Boiler Area

-Switch Gear building

Exhaust gas treatment unit

Total Investment: 17 million EUR