Construction of new foundations for special-purpose machines in Erfurt, Germany

Principal: SIEMENS AG Power Generation Werk Erfurt

Realisation Period: 2009 - 2012

Services: Structural Engineering

AIC took over the engineering of foundation for special-purpose machines within a existing production facility. The foundation works were realized while keep running the production.

Some parameters:

–  2 Turning machines: 25 x 7 m

–  Soldering pit: 26 x 7 m

–  Milling machine: 18 x 7 m

–  Slot cutting machine: 27 x 9 m

Construction Costs: 4.8 mill. EUR